State-of- the-art chicken protein plant

GMM transformed a conventional risk material dry rendering facility with 40.000t/a capacity into a state-of-the-art low temperature 80.000t/a chicken protein plant in a record time. With careful preparations it took merely three months from the day the old plant stopped to the day when the new production was running.
Only the building itself, HVAC system and raw material silos remained the same, everything else was changed. This became a true success story of rapidly adapting to the market changes in a capital intensive processing industry.